4.22.09 NEDC Draft Request for Proposal
(RFP) released.
4.21.09 Draft Request for Proposal (RFP)
released for ACES, NICS, and WEST.
4.21.09 Updated EAST Draft PWS and EAST
Draft Background & Historical (Attachment L-B)
released.
4.6.09 Industry Day Registration:
April 7-17, 2009.
4.2.09 NEDC Draft RFP Synopsis released
and posted to I3P website Technical Library
1.14.09 ACES PWS Released
1.8.09 The synopsis for the ACES draft
PWS and one-on-one meetings has been posted on
NAIS and FedBizOpps.
12.19.08 EAST PWS Released
12.04.08 I3P Baseline Procurement
Schedule published
12.04.08 Technical Library Format updated
12.04.08 The following document was
updated in the Technical Library for the NICS
contract:
NCI Problem Statement
10.31.08 NASA now anticipates that draft
PWS information for the I3P procurements will be
published no earlier than late November/early
December 2008. Consistent with this schedule,
one-on-one meetings between Industry and the
procurement development teams are not
anticipated prior to early December 2008 and a
draft RFP will not be issued before January
2009. NASA plans to publish a baseline schedule
for these acquisitions by the end of November
2008.
9.22.08 The following document was
updated in the Technical Library:
Enterprise Service Catalog
9.8.08 The following document is
available in the Technical Library:
Enterprise Service Catalog Comments
and Dispositions
8.27.08 The following document was
updated in the Technical Library:
NASA Integrated Communications Services
Request for Information
8.26.08 The following documents are
available in the Technical Library:
1. Firewall & LAN Briefing to ITMB
2. Zone Architecture White Paper